SOLAR Β· OPERATIONAL

Seaton Road

Seaton Road is a 4.16 MW solar farm in East Midlands England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningJul 2015 (completed)
  2. ConsentedSep 2015 (completed)
  3. ConstructionOct 2016 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.16 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
LE15 9BG
Coordinates
52.5853, -0.7090

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Seaton Road compares

523rd of 662largest solar farms in the UK register
75th of 95in East Midlands
0.07%of listed UK solar farms capacity
β‰ˆ 3.6 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.16 MW station would generate roughly 3.6 GWh of electricity in a year, similar to the annual use of about 1,350 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Seaton Road Solar Farm
Developer / operator
SBC Renewables
Planning authority
Rutland
Planning reference
2015/0662/MAJ
Application submitted
23 July 2015
Permission granted
30 September 2015
Construction started
15 October 2016
Began operating
31 March 2017
Capacity in planning record
4 MW
Address
Land north of, Seaton Road, Uppingham, Oakham, Leicestershire, LE15 9HH
REPD reference
5532

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.