Nailstone
Nailstone is a 4.98 MW solar farm in East Midlands England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 4.98 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- WPO UK Services
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 52.6637, -1.3690
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Nailstone compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.98 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by WPO UK ServicesNearby generating sites
- Tower Hayes Β· 5 MW solar farm3.8 km
- Ibstock Β· 4.82 MW solar farm3.9 km
- Lindridge Β· 4.92 MW solar farm4.5 km
- Spring Lane Β· 0.96 MW solar farm9.4 km
- Stables Β· 1.97 MW solar farm10.7 km
- Basin Bridge Β· 4.99 MW solar farm11.9 km
- Ratcliffe House Farm Β· 3.5 MW solar farm12.1 km
- Prestop Park Β· 15.9 MW solar farm12.9 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Crown Farm
- Developer / operator
- Suncredit UK (Sunventures 7)
- Planning authority
- Hinckley and Bosworth
- Planning reference
- 15/00823/FUL
- Application submitted
- 28 July 2015
- Permission granted
- 30 September 2015
- Construction started
- 15 February 2016
- Began operating
- 1 March 2017
- Capacity in planning record
- 6 MW
- Address
- Crown Farm, Bagworth Road, Nailstone, Nuneaton, Warwickshire, West Midlands, Leicestershire, CV13 0QL
- REPD reference
- 5357
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.