Milborne Port
Milborne Port is a 3.29 MW solar farm in South West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 3.29 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DT9 5EF
- Coordinates
- 50.9755, -2.4541
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Milborne Port compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.29 MW station would generate roughly 2.9 GWh of electricity in a year, similar to the annual use of about 1,070 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by AnescoNearby generating sites
- Sutor Β· 4.99 MW solar farm8.6 km
- Chilton Cantelo Solar park Β· 5 MW solar farm10.6 km
- Southfield Β· 9.76 MW solar farm11.9 km
- Rudge Hill Farm Β· 1.02 MW solar farm12.1 km
- Slaughtergate Β· 1.84 MW solar farm12.7 km
- Manor Farm Dorset Β· 4.92 MW solar farm12.9 km
- Caswell Β· 5.91 MW solar farm14.9 km
- Manor Farm Β· 4.87 MW solar farm16.7 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Milborne Port Solar Farm
- Developer / operator
- Big 60 Million
- Planning authority
- Somerset
- Planning reference
- 15/02187/FUL
- Application submitted
- 18 May 2015
- Permission granted
- 18 August 2016
- Construction started
- 15 February 2018
- Began operating
- 25 June 2018
- Capacity in planning record
- 4.2 MW
- Address
- Land OS 2269, Old Bowden Way, Milborne Port, Sherborne, Somerset, DT9
- REPD reference
- 5290
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.