SOLAR Β· OPERATIONAL

Granville

Granville is a 4.44 MW solar farm in West Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • West Midlands
  • England
Project stageOperating
  1. PlanningSep 2015 (completed)
  2. ConsentedDec 2015 (completed)
  3. ConstructionAug 2016 (completed)
  4. OperatingOct 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.44 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
West Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TF2 8PQ
Coordinates
52.7173, -2.4106

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Granville compares

504th of 662largest solar farms in the UK register
36th of 44in West Midlands
0.08%of listed UK solar farms capacity
β‰ˆ 3.9 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.44 MW station would generate roughly 3.9 GWh of electricity in a year, similar to the annual use of about 1,440 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in West Midlands All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Granville Road Solar Farm
Developer / operator
Solstice Renewables
Planning authority
Telford and Wrekin
Planning reference
TWC/2015/0804
Application submitted
7 September 2015
Permission granted
11 December 2015
Construction started
24 August 2016
Began operating
24 October 2016
Capacity in planning record
5 MW
Address
Land West and South West of Granville Road, Muxton Grange Cottages, Donnington, Telford, Shropshire, TF2 7QG
REPD reference
5670

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026