πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Albrighton

Albrighton is a 4.97 MW solar farm in West Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • West Midlands
  • England
Project stageOperating
  1. PlanningJul 2015 (completed)
  2. ConsentedDec 2015 (completed)
  3. ConstructionNov 2016 (completed)
  4. OperatingFeb 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.97 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
West Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
WV9 1RQ
Coordinates
52.6438, -2.2381

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Albrighton compares

406th of 662largest solar farms in the UK register
26th of 44in West Midlands
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.97 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,610 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in West Midlands All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Albrighton Solar farm
Developer / operator
Big 60 Million
Planning authority
Shropshire
Planning reference
15/02787/FUL
Application submitted
24 July 2015
Permission granted
14 December 2015
Construction started
28 November 2016
Began operating
28 February 2017
Capacity in planning record
15.8 MW
Address
Land To The North of Harriotts Hayes Lane, Codsall Wood, Wolverhampton, Shropshire, WV8 1RQ
REPD reference
5506

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.