Dunsfold
Dunsfold is a 2 MW solar farm in South East England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South East
- England
Key facts
- Installed capacity
- 2 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Lightsource BP
- Region
- South East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- GU8 4BW
- Coordinates
- 51.1193, -0.5448
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Dunsfold compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 2 MW station would generate roughly 1.8 GWh of electricity in a year, similar to the annual use of about 650 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South East All run by Lightsource BPNearby generating sites
- Five Oaks Β· 5 MW solar farm9.6 km
- Spear Hill Β· 4.95 MW solar farm22.3 km
- Ford Β· 11.6 MW solar farm25.0 km
- Wilsom Farm Β· 4.01 MW solar farm29.2 km
- Hungerford Β· 4.47 MW solar farm29.4 km
- Majors Hill Β· 1.15 MW solar farm30.1 km
- Binsted Β· 5 MW solar farm30.4 km
- Upper Farringdon Β· 6.18 MW solar farm30.4 km
Also operated by Lightsource BP
Lightsource BP operates 129 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Dunsfold Park Solar Farm
- Developer / operator
- Dunsfold Park Ltd
- Planning authority
- Waverley
- Planning reference
- WA/2010/1904
- Application submitted
- 3 November 2010
- Permission granted
- 30 March 2011
- Began operating
- 26 July 2011
- Capacity in planning record
- 2 MW
- Address
- Land To The East Side Of High Loxley Road, Stovolds Hill, Cranleigh, Surrey, GU8 4BS
- REPD reference
- 1084
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.