Ford

Ford is a 11.6 MW solar farm in South East England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South East
  • England

Key facts

Installed capacity
11.6 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
South East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BN44 3AT
Coordinates
50.9422, -0.3254

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Ford compares

118th of 662largest solar farms in the UK register
22nd of 105in South East
0.20%of listed UK solar farms capacity
β‰ˆ 10 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 11.6 MW station would generate roughly 10 GWh of electricity in a year, similar to the annual use of about 3,750 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South East All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Ford Farm (Ashurst)
Developer / operator
Conergy
Planning authority
Horsham
Planning reference
DC/13/2310
Application submitted
9 December 2013
Permission granted
9 September 2015
Construction started
15 November 2015
Began operating
29 February 2016
Capacity in planning record
10 MW
Address
Land North of Sopers Copse Honeybridge Lane Ashurst West Sussex, West Sussex
REPD reference
1531

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.