SOLAR Β· OPERATIONAL

Derwyn

Derwyn is a 4.66 MW solar farm in Wales, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningJun 2015 (completed)
  2. ConsentedSep 2015 (completed)
  3. ConstructionJan 2017 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.66 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CF62 3AA
Coordinates
51.4162, -3.3144

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Derwyn compares

479th of 662largest solar farms in the UK register
53rd of 75in Wales
0.08%of listed UK solar farms capacity
β‰ˆ 4.1 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.66 MW station would generate roughly 4.1 GWh of electricity in a year, similar to the annual use of about 1,510 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Cwm Derwyn Farm
Developer / operator
Kronos Solar
Planning authority
Vale of Glamorgan
Planning reference
2015/00632/FUL
Application submitted
1 June 2015
Permission granted
4 September 2015
Construction started
15 January 2017
Began operating
17 March 2017
Capacity in planning record
5 MW
Address
Cwm Derwyn Farm, Waycock Road, Barry, South Glamorgan, Vale of Glamorgan, CF62 3AA
REPD reference
5477

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.