Home Farm
Home Farm is a 3.06 MW solar farm in Wales, operated by Capital Dynamics UK. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 3.06 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Capital Dynamics UK
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 51.4745, -3.2928
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Home Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.06 MW station would generate roughly 2.7 GWh of electricity in a year, similar to the annual use of about 990 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by Capital Dynamics UKNearby generating sites
- Sutton Mawr Β· 7.52 MW solar farm6.6 km
- Derwyn Β· 4.66 MW solar farm6.7 km
- Biglis Β· 4.97 MW solar farm6.8 km
- Treguff Β· 3.74 MW solar farm9.3 km
- Maes Bach Β· 4.56 MW solar farm9.9 km
- Llancadle Β· 4.99 MW solar farm10.0 km
- West Hall Β· 5.51 MW solar farm11.8 km
- Berthllwyd Β· 4.96 MW solar farm12.4 km
Also operated by Capital Dynamics UK
Capital Dynamics UK operates 25 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Cenin Renewables
- Planning authority
- Vale of Glamorgan
- Planning reference
- 2015/00852/FUL
- Application submitted
- 30 July 2015
- Permission granted
- 14 January 2016
- Construction started
- 9 January 2017
- Began operating
- 15 April 2017
- Capacity in planning record
- 3 MW
- Address
- Home Farm, land West of Drope Road, St. George's-super-Ely, Cardiff, South Glamorgan, Wales, Vale of Glamorgan, CF5 6EP
- REPD reference
- 5104
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.