SOLAR Β· OPERATIONAL

Rosedew

Rosedew is a 4.98 MW solar farm in Wales, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales
Project stageOperating
  1. PlanningMar 2015 (completed)
  2. ConsentedNov 2022 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.98 MW
Status
Operational
Technology
Solar Β· PV
Operator
WPO UK Services
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
51.3989, -3.4838

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Rosedew compares

386th of 662largest solar farms in the UK register
40th of 75in Wales
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.98 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by WPO UK Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Rosedew Farm
Developer / operator
INRG
Planning authority
Vale of Glamorgan
Planning reference
2015/00218/FUL
Application submitted
2 March 2015
Permission granted
4 November 2022
Construction started
29 January 2016
Began operating
29 March 2016
Capacity in planning record
5 MW
Address
Land at Rosedew Farm, Beach Road, Llantwit Major, Vale of Glamorgan, CF61 1PZ
REPD reference
6369

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.