Rosedew
Rosedew is a 4.98 MW solar farm in Wales, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 4.98 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- WPO UK Services
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 51.3989, -3.4838
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Rosedew compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.98 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by WPO UK ServicesNearby generating sites
- Aberthaw B Power Station Β· 1,586 MW coal-fired power station5.4 km
- West Hall Β· 5.51 MW solar farm5.6 km
- Treguff Β· 3.74 MW solar farm6.4 km
- Llancadle Β· 4.99 MW solar farm6.8 km
- Corntown Solar Β· 2.48 MW solar farm10.0 km
- Sutton Mawr Β· 7.52 MW solar farm10.6 km
- Derwyn Β· 4.66 MW solar farm11.9 km
- Home Farm Β· 3.06 MW solar farm15.7 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Rosedew Farm
- Developer / operator
- INRG
- Planning authority
- Vale of Glamorgan
- Planning reference
- 2015/00218/FUL
- Application submitted
- 2 March 2015
- Permission granted
- 4 November 2022
- Construction started
- 29 January 2016
- Began operating
- 29 March 2016
- Capacity in planning record
- 5 MW
- Address
- Land at Rosedew Farm, Beach Road, Llantwit Major, Vale of Glamorgan, CF61 1PZ
- REPD reference
- 6369
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.