Cleave Farm
Cleave Farm is a 4.56 MW solar farm in South West England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 4.56 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Lightsource BP
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- EX39 4PU
- Coordinates
- 51.0039, -4.1408
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Cleave Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.56 MW station would generate roughly 4.0 GWh of electricity in a year, similar to the annual use of about 1,480 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by Lightsource BPNearby generating sites
- Knockworthy Farm Solar Park Β· 4.65 MW solar farm2.4 km
- Week Farm 2 Β· 3.73 MW solar farm6.0 km
- Hollamoor Β· 2.24 MW solar farm7.0 km
- Horsacott Solar Farm Β· 6.54 MW solar farm7.1 km
- Galsworthy Β· 9.2 MW onshore wind farm13.3 km
- Bulkworthy Solar Β· 6.24 MW solar farm13.8 km
- Southcombe Farm Β· 1.21 MW solar farm14.1 km
- Walland Farm Β· 5 MW solar farm14.7 km
Also operated by Lightsource BP
Lightsource BP operates 129 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Cleave Farm Solar Park
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- Torridge
- Planning reference
- 1/0997/2012/FULM
- Application submitted
- 19 November 2012
- Permission granted
- 18 February 2013
- Began operating
- 25 October 2013
- Capacity in planning record
- 4.7 MW
- Address
- Land Adjacent Alverdiscott Substation Near Gammaton Moor Alverdiscott Devon, Devon
- REPD reference
- 1649
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026