Churchtown Farm Solar is a 4.99 MW solar farm in South West England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningFeb 2011 (completed)
  2. ConsentedApr 2011 (completed)
  3. Construction (completed)
  4. OperatingJul 2011 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.99 MW
Status
Operational
Technology
Solar Β· PV
Operator
RES Group
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
50.2179, -5.3681

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Churchtown Farm Solar compares

351st of 662largest solar farms in the UK register
94th of 192in South West
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.99 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Nanterrow Farm
Developer / operator
Low carbon Solar Partners
Planning authority
Cornwall
Planning reference
PA11/00751
Application submitted
7 February 2011
Permission granted
14 April 2011
Began operating
25 July 2011
Capacity in planning record
4.7 MW
Address
Churchtown Farm, Gwithian, Land South Of Nanterrow Cottage, Nanterrow Lane, Connor Downs, Cornwall, Cornwall
REPD reference
1020

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.