SOLAR Β· OPERATIONAL

Carrowdore

Carrowdore is a 5.98 MW solar farm in Northern Ireland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Northern Ireland
Project stageOperating
  1. PlanningOct 2014 (completed)
  2. ConsentedJun 2015 (completed)
  3. ConstructionOct 2016 (completed)
  4. OperatingFeb 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5.98 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
Northern Ireland
Country
Northern Ireland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
BT22 2HH
Coordinates
54.5716, -5.5692

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Carrowdore compares

225th of 662largest solar farms in the UK register
8th of 16in Northern Ireland
0.11%of listed UK solar farms capacity
β‰ˆ 5.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5.98 MW station would generate roughly 5.2 GWh of electricity in a year, similar to the annual use of about 1,940 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Northern Ireland All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Ballyboley Solar (Carrowdore)
Developer / operator
Island Green Power
Planning authority
Ards and North Down
Planning reference
X/2014/0538/F
Application submitted
3 October 2014
Permission granted
3 June 2015
Construction started
1 October 2016
Began operating
28 February 2017
Capacity in planning record
6 MW
Address
Lands 88m West of 2a Ballyblack Road East, Carrowdore, Newtownards, Co. Down, BT22 2HH
REPD reference
4724

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.