SOLAR Β· OPERATIONAL

Carlisle Estate

Carlisle Estate is a 5 MW solar farm in North West England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • North West
  • England
Project stageOperating
  1. PlanningJul 2015 (completed)
  2. ConsentedOct 2015 (completed)
  3. ConstructionFeb 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
5 MW
Status
Operational
Technology
Solar Β· PV
Operator
Octopus Investments
Region
North West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CA5 7ES
Coordinates
54.8049, -2.9969

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Carlisle Estate compares

252nd of 662largest solar farms in the UK register
3rd of 23in North West
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in North West All run by Octopus Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land west of Welton Road
Developer / operator
Lightsource Renewable Energy
Planning authority
Cumberland
Planning reference
15/0630
Application submitted
3 July 2015
Permission granted
23 October 2015
Construction started
3 February 2016
Began operating
29 March 2016
Capacity in planning record
4.4 MW
Address
Land west of, Welton Road, Dalston, Carlisle, Cumbria, Cumbria, CA5 7EL
REPD reference
5412

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.