πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Bourne Park

Bourne Park is a 0.25 MW solar farm in South West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • South West
  • England
Project stageOperating
  1. PlanningAug 2013 (completed)
  2. ConsentedOct 2013 (completed)
  3. ConstructionJan 2015 (completed)
  4. OperatingMar 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
0.25 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
South West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
DT2 7TU
Coordinates
50.7771, -2.3970

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bourne Park compares

662nd of 662largest solar farms in the UK register
192nd of 192in South West
0.00%of listed UK solar farms capacity
β‰ˆ 0.2 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 0.25 MW station would generate roughly 0.2 GWh of electricity in a year, similar to the annual use of about 80 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in South West All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bourne Park (Solar)
Developer / operator
Sovereign Energy Partners LLP
Planning authority
Dorset
Planning reference
1/D/13/001116
Application submitted
9 August 2013
Permission granted
30 October 2013
Construction started
1 January 2015
Began operating
19 March 2015
Capacity in planning record
5 MW
Address
Hanford Plc, Bourne Park, Piddlehinton, Dorchester, Dorset, DT2 7TU
REPD reference
2361

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.