Bourne Park 2
Bourne Park 2 is a 2.4 MW solar farm in South West England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- South West
- England
Key facts
- Installed capacity
- 2.4 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- South West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DT2 7TU
- Coordinates
- 50.7756, -2.3952
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Bourne Park 2 compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 2.4 MW station would generate roughly 2.1 GWh of electricity in a year, similar to the annual use of about 780 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in South West All run by AnescoNearby generating sites
- Bourne Park Β· 0.25 MW solar farm0.2 km
- Redbridge Β· 6.48 MW solar farm9.8 km
- Crossways Solar Park Β· 5 MW solar farm10.3 km
- Long Ash Lane Solar Park Β· 5 MW solar farm12.4 km
- Rudge Hill Farm Β· 1.02 MW solar farm16.3 km
- Littleton Farm Β· 12 MW solar farm17.8 km
- Newlands Β· 5 MW solar farm17.9 km
- Chickerell Β· 50 MW open-cycle gas power station18.4 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Bourne Farm
- Developer / operator
- Farm Power Apollo
- Planning authority
- Dorset
- Planning reference
- 1/D/13/001044
- Application submitted
- 1 August 2013
- Permission granted
- 14 October 2013
- Construction started
- 30 November 2014
- Began operating
- 15 March 2015
- Capacity in planning record
- 2.4 MW
- Address
- Field B8 at Bourne Farm, adjacent to the Bourne Park Industrial Estates, Dorset
- REPD reference
- 6062
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.