πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Bedford

Bedford is a 0.63 MW solar farm in East Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningDec 2023 (completed)
  2. ConsentedFeb 2024 (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
0.63 MW
Status
Operational
Technology
Solar Β· PV
Operator
Anesco
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
MK44 3SD
Coordinates
52.0995, -0.5043

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bedford compares

657th of 662largest solar farms in the UK register
94th of 95in East Midlands
0.01%of listed UK solar farms capacity
β‰ˆ 0.6 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 0.63 MW station would generate roughly 0.6 GWh of electricity in a year, similar to the annual use of about 200 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Anesco

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Planning Permission Granted
Site name in planning record
Marsh Leys Farm, Woburn Road - Photovoltaics
Developer / operator
Sainsburys Supermarkets Limited
Planning authority
Bedford
Planning reference
23/02668/SPNJ
Application submitted
11 December 2023
Permission granted
1 February 2024
Capacity in planning record
0.52 MW
Address
Unit 2, Marsh Leys Farm, Woburn Road, Kempston, Bedford, Bedfordshire, MK43 9AA
REPD reference
15522

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.