Ashby
Ashby is a 4.8 MW solar farm in East Midlands England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 4.8 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- WPO UK Services
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 52.7565, -1.4899
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Ashby compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.8 MW station would generate roughly 4.2 GWh of electricity in a year, similar to the annual use of about 1,560 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by WPO UK ServicesNearby generating sites
- Ashby Β· 4.8 MW solar farm0.0 km
- Prestop Park Β· 15.9 MW solar farm1.5 km
- Short Hazel Β· 5 MW solar farm2.6 km
- Spring Lane Β· 0.96 MW solar farm3.8 km
- Ibstock Β· 4.82 MW solar farm9.6 km
- Langley Priory Β· 2.04 MW solar farm10.5 km
- Willington Power Station Β· 400 MW coal-fired power station12.0 km
- Tower Hayes Β· 5 MW solar farm12.2 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Abandoned
- Site name in planning record
- Ashby Solar Farm (b)
- Developer / operator
- Solstice Renewables
- Planning authority
- North West Leicestershire
- Planning reference
- 15/00500/FULM
- Application submitted
- 26 May 2015
- Permission granted
- 9 September 2015
- Capacity in planning record
- 1 MW
- Address
- Land To The East Of B41, Meash, Packington, Ashby De La Zouch And North Of, Ashby-De-La-Zouch, Leicestershire, LE65 1W
- REPD reference
- 5275
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.