Projects shown7315 MW in total
In planning7scoping or awaiting consent
Consented or building0closest to connecting
Built0connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

7 projects
ProjectCapacityStageConnection siteFrom
Fasque Windfarm
Solar Β· Scottish Power Renewables (UK) Limited
105 MWScoping Fetteresso 132kV substation
SSEN Transmission (north Scotland)
Oct 2031
Coupar Solar Farm
Solar Β· Coupar Two Limited
50 MWScoping Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Apr 2027
Craigend
Solar Β· Renewable Energy Systems Limited
50 MWScoping Arbroath GSP
SSEN Transmission (north Scotland)
Jun 2032
Fauldielaw
Solar Β· Cairn Duhie Energy Limited
50 MWScoping Arbroath 2 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2032
Sage
Solar Β· Sage North Sea Limited
20 MWScoping St Fergus Mobil 132/11kV Substation
SSEN Transmission (north Scotland)
Apr 2029
Shire End Solar Farm
Solar Β· Qair Scotland Limited
20 MWScoping Abernethy 2 GSP
SSEN Transmission (north Scotland)
Oct 2033
Stoneygroves PV
Solar Β· Enviromena Project Management UK Limited
20 MWScoping Charleston GSP 132/33kV
SSEN Transmission (north Scotland)
Oct 2031

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.