Battery storage projects in the connection queue on the SP Transmission (south Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown91.2 GW in total
In planning158scoping or awaiting consent
Consented or building33closest to connecting
Built9connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

9 projects
ProjectCapacityStageConnection siteFrom
Coalburn Battery Energy Storage Facility
Battery storage Β· Alcemi Storage Developments 4 Limited
500 MWBuilt Coalburn 400kV Substation
SP Transmission (south Scotland)
Zenobe Kilmarnock South
Battery storage Β· Zenobe Kilmarnock South Limited
300 MWBuilt Kilmarnock South 400kV Substation
SP Transmission (south Scotland)
Neilston 132
Battery storage Β· Neilston Energy Limited
150 MWBuilt Neilston 132kV Substation
SP Transmission (south Scotland)
Oct 2025
Almondell Lodge BESS & Solar Development
Battery storage Β· Broxburn Energy Storage Limited
50 MWBuilt Broxburn 132/33kV
SP Transmission (south Scotland)
Little Raith BES
Battery storage Β· Heit Lr Limited
50 MWBuilt Glenniston GSP
SP Transmission (south Scotland)
Roaring Hill Energy Storage Facility
Battery storage Β· Roaring Hill Energy Storage Ltd
50 MWBuilt Glenrothes GSP
SP Transmission (south Scotland)
Wishaw Energy Storage Facility
Battery storage Β· Zenobe Wishaw Limited
50 MWBuilt Wishaw 400/275kV
SP Transmission (south Scotland)
Holmston Farm Battery Energy Storage System
Battery storage Β· Field Holmston Ltd
50 MWBuilt Ayr 275/33kV
SP Transmission (south Scotland)
Care Erskine BEGA
Battery storage Β· Care Power (Erskine) Limited
30 MWBuilt Erskine 132/33kV
SP Transmission (south Scotland)

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.