NESO TEC REGISTER Β· GREAT BRITAINBattery storage projects in the connection queue on the SP Transmission (south Scotland) network
Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.
Map
Voltage400 kV275 kV132 kVHVDCNew HVAC
ProjectsPlanningConsentedConstructionBuiltMajor project with its own page
Projects
| Project | Capacity | Stage |
|---|---|---|
| Coalburn Battery Energy Storage Facility Battery storage Β· Alcemi Storage Developments 4 Limited |
500 MW | |
| Zenobe Kilmarnock South Battery storage Β· Zenobe Kilmarnock South Limited |
300 MW | |
| Neilston 132 Battery storage Β· Neilston Energy Limited |
150 MW | |
| Almondell Lodge BESS & Solar Development Battery storage Β· Broxburn Energy Storage Limited |
50 MW | |
| Little Raith BES Battery storage Β· Heit Lr Limited |
50 MW | |
| Roaring Hill Energy Storage Facility Battery storage Β· Roaring Hill Energy Storage Ltd |
50 MW | |
| Wishaw Energy Storage Facility Battery storage Β· Zenobe Wishaw Limited |
50 MW | |
| Holmston Farm Battery Energy Storage System Battery storage Β· Field Holmston Ltd |
50 MW | |
| Care Erskine BEGA Battery storage Β· Care Power (Erskine) Limited |
30 MW |
Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed βconnection nodesβ are listed but not mapped.