Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Almondell Lodge BESS & Solar Development

Almondell Lodge BESS & Solar Development is a 50 MW battery storage project built and connected, connecting to the SP Transmission (south Scotland) network at Broxburn 132/33kV. The connection agreement is held by Broxburn Energy Storage Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001667
Customer
Broxburn Energy Storage Limited
Technology
Energy Storage System
Total capacity
50 MW
Already connected
50 MW
Connection site
Broxburn 132/33kV
Transmission owner
SP Transmission (south Scotland)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built
Connections reform gate
Gate 2

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Broxburn · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem