Projects shown7360 MW in total
In planning513scoping or awaiting consent
Consented or building47closest to connecting
Built9connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

7 projects
ProjectCapacityStageConnection siteFrom
West Burton
Solar + storage Β· Enso Green Holdings A Limited
120 MWUnder Construction/Commissioning West Burton 132kV Substation
National Grid (England & Wales)
Jun 2027
Bramley (tertiary)
Solar + storage Β· Bramley Solar Limited
57 MWUnder Construction/Commissioning Bramley 400kV Substation
National Grid (England & Wales)
Oct 2027
Bicker Fen 1 Solar
Solar + storage Β· Agr Solar 2 Limited
50 MWUnder Construction/Commissioning Bicker Fen 400kV Substation
National Grid (England & Wales)
Oct 2026
Keithick Estate
Solar + storage Β· Sirius Ecodev (Stirling) Ltd
50 MWUnder Construction/Commissioning Coupar Angus 132/33kV GSP
SSEN Transmission (north Scotland)
Dec 2026
Worset PV & BESS Park
Solar + storage Β· Worcestershire Solar 1 Limited
38 MWUnder Construction/Commissioning Hartmoor 275kV Substation
National Grid (England & Wales)
Oct 2027
Bilbo Farm
Solar + storage Β· Lel Bilbo Solar Limited
25 MWUnder Construction/Commissioning Strichen 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Jun 2024
Kincraig Energy Centre
Solar + storage Β· Kincraig Energy Centre Limited
21 MWUnder Construction/Commissioning Dyce 132/33kV GSP
SSEN Transmission (north Scotland)
Apr 2025

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed β€œconnection nodes” are listed but not mapped.