🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Gas projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown10458.1 GW in total
In planning14scoping or awaiting consent
Consented or building7closest to connecting
Built83connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

104 projects · page 3 of 3
ProjectCapacityStageConnection siteFrom
PeakGen BEGA - Coventry
Gas · Peak Gen Top Co Limited
6 MWBuilt Coventry GSP
National Grid (England & Wales)
PeakGen BEGA - Hatfield
Gas · Peak Gen Top Co Limited
6 MWBuilt Hatfield GSP
National Grid (England & Wales)
PeakGen BEGA - Haydock
Gas · Peak Gen Power Limited
6 MWBuilt Haydock GSP
National Grid (England & Wales)
PeakGen BEGA - Didcot
Gas · Peak Gen Power Limited
4 MWBuilt Didcot GSP
National Grid (England & Wales)
Page 3 of 3

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.