Battery storage projects in the connection queue on the SSEN Transmission (north Scotland) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown11122.7 GW in total
In planning91scoping or awaiting consent
Consented or building16closest to connecting
Built4connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

111 projects · page 3 of 3
ProjectCapacityStageConnection siteFrom
Jamesfield Farm Battery Storage
Battery storage · Harmony Jf Limited
30 MWBuilt Abernethy GSP
SSEN Transmission (north Scotland)
Templeton BESS
Battery storage · Templeton Battery Storage Limited
30 MWScoping Lyndhurst 132/33kV
SSEN Transmission (north Scotland)
Oct 2027
MeyGen Tidal
Battery storage · Meygrid Limited
28 MWConsents Approved Gills Bay GSP
SSEN Transmission (north Scotland)
Apr 2027
Battery Point BESS
Battery storage · Point and Sandwick Power Limited
25 MWScoping Stornoway GSP
SSEN Transmission (north Scotland)
Oct 2030
Strichen North BESS
Battery storage · Muirden Energy LLP
25 MWScoping Strichen GSP
SSEN Transmission (north Scotland)
Oct 2033
Talladh a Bheithe
Battery storage · Muirden Energy LLP
20 MWScoping Rannoch GSP
SSEN Transmission (north Scotland)
Oct 2035
Tarland Battery Storage System
Battery storage · Tarland Limited
20 MWConsents Approved Tarland 132/33kV GSP Substation
SSEN Transmission (north Scotland)
Oct 2026
Kincorth BESS
Battery storage · Kincorth Energy Storage System Ltd
20 MWScoping Redmoss GSP
SSEN Transmission (north Scotland)
Oct 2031
Jamesfield Farm Phase 2 Battery Storage
Battery storage · Harmony Jf Limited
19 MWBuilt Abernethy GSP
SSEN Transmission (north Scotland)
Scatsta1 Greener Grid Park
Battery storage · Statkraft Hydrogen UK Holding Limited
5 MWScoping Scatsta 132kV Substation
SSEN Transmission (north Scotland)
Oct 2028
Keith 132 Greener Grid Park
Battery storage · Keith Storage Solutions Limited
0 MWBuilt Keith 132kV Substation
SSEN Transmission (north Scotland)
Page 3 of 3

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.