πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Battery storage β€Ί California

OCTARY USA Β· BATTERY STORAGE

Under-construction battery storage sites in California

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating282plants
Operating capacity16.5 GWnameplate
Under construction4,347 MW47 plants
Whole pipeline9,936 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

47 plants
PlantCapacityStageStateOwner / operatorYear
Bellefield 2 Solar & Energy Storage Farm 500 MW Under construction CA
Kern
26SB 8me LLC 2026
SE Athos II, LLC 402 MW Under construction CA
Riverside
SE Athos II, LLC 2027
Gabriel 400 MW Under construction CA
Los Angeles
San Gabriel Project LLC 2027
Marici 400 MW Under construction CA
Los Angeles
Marici Project LLC 2027
Pelicans Jaw Hybrid Solar 239 MW Under construction CA
Kern
Pelicans Jaw Solar LLC 2027
Anode (Springville) BESS 225 MW Under construction CA
Tulare
Southern California Edison Co 2027
Sanborn Hybrid 3 210 MW Under construction CA
Kern
Terra-Gen Operating Co-Hybrid 2026
Country Acres Clean Power LLC 172 MW Under construction CA
Placer
Clenera DevCo LLC 2027
Vidal Energy Center 160 MW Under construction CA
San Bernardino
CDH Vidal LLC 2026
Overnight Solar 150 MW Under construction CA
San Bernardino
Overnight Solar LLC 2027
Rosamond South II 140 MW Under construction CA
Kern
Golden Fields Solar VI, LLC 2027
Midway BESS 125 MW Under construction CA
Fresno
Midway BESS LLC 2027
Aratina Solar Center 2 113 MW Under construction CA
Kern
45MG 8me LLC 2026
Westminster Reliability Project, LLC 110 MW Under construction CA
Orange
RWE Americas, LLC 2026
Sacramento Valley Energy Center, LLC 100 MW Under construction CA
Sacramento
Sacramento Valley Energy Center, LLC 2029
Noosa Energy Storage LLC 99.0 MW Under construction CA
San Joaquin
Engie North America 2026
Stellar Wright BESS 84.8 MW Under construction CA
Merced
Stellar Renewable Power 2026
Key Energy Storage 75.0 MW Under construction CA
Fresno
Key Energy Storage LLC 2026
Zeta Solar & Storage 75.0 MW Under construction CA
Merced
Zeta Solar, LLC 2027
EDPR Scarlet III 70.0 MW Under construction CA
Fresno
EDPR Scarlet III LLC 2026
JVR Energy Park LLC 70.0 MW Under construction CA
San Diego
JVR Energy Park LLC 2027
Jasmine 64.4 MW Under construction CA
Kern
AES Clean Energy 2027
Iron BESS 59.5 MW Under construction CA
Fresno
Panoche BESS LLC 2027
Baldy Mesa Storage 50.0 MW Under construction CA
San Bernardino
AES Clean Energy 2027
Kifer BESS 1 50.0 MW Under construction CA
Santa Clara
Kifer Energy Storage, LLC 2026
EDPR CA Solar Park VI LLC (CA) Hybrid 40.0 MW Under construction CA
Fresno
EDPR CA Solar Park VI LLC 2026
Tracy BESS 40.0 MW Under construction CA
San Joaquin
Middle River Power 2027
Chalan 25.0 MW Under construction CA
Kern
Origis Energy USA, Inc 2026
Solar Star 3 23.0 MW Under construction CA
Kern
Solar Star 3, LLC 2026
Solar Star 4 23.0 MW Under construction CA
Kern
Solar Star 4, LLC 2026
Gaskell West Storage 1, LLC 21.6 MW Under construction CA
Kern
Matrix Renewables 2026
Industrial Parkway Storage 9.8 MW Under construction CA
Santa Barbara
RPCA Storage 1, LLC 2026
Madena 3 3.9 MW Under construction CA
Yuba
ZGlobal Inc 2026
EnerSmart Mesa Heights Sub Station 3.0 MW Under construction CA
San Diego
EnerSmart Storage 2026
Merced BESS 3.0 MW Under construction CA
Merced
ZGlobal Inc 2026
Redlands DC 9 - sline609 2.4 MW Under construction CA
San Bernardino
Prologis Logistics Services Incorporated 2026
CA Riverside 2356 Fleetwood Dr. 2.0 MW Under construction CA
Riverside
Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC 2026
Six Flags Magic Mountain 2.0 MW Under construction CA
Los Angeles
Magic Mountain Parkway Solar Project 2023, LLC 2026
CA Bloomington 2551 S Lilac Avenue Micro 1.5 MW Under construction CA
San Bernardino
Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC 2026
Bishop Ranch - BR 3-FF 0.6 MW Under construction CA
Contra Costa
Camino Ramon BR 3-FF Solar Project 2020, LLC 2027
Bishop Ranch - BR 3-GG 0.6 MW Under construction CA
Contra Costa
Camino Ramon BR 3-GG Solar Project 2020, LLC 2027
Bishop Ranch - BR 3-HH 0.6 MW Under construction CA
Contra Costa
Camino Ramon BR 3-HH Solar Project 2020, LLC 2027
Las Virgenes MWD - Composting Plant 0.5 MW Under construction CA
Los Angeles
Las Virgenes Road Solar Project 2022, LLC 2026
Sanger USD - Sanger West HS 0.5 MW Under construction CA
Fresno
South Fowler Avenue Solar Project 2023, LLC 2026
Bakersfield Driver 0.3 MW Under construction CA
Kern
Pacifico Bakersfield Driver LLC 2026
Palmdale Water District 6MG Tank 0.3 MW Under construction CA
Los Angeles
East Avenue South Solar Project 2022, LLC 2026
Pivot Energy PPA 29 LLC 0.1 MW Under construction CA
Placer
Pivot Energy 2027

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map