United States › Power plants › Battery storage › California
BATTERY STORAGE · SOLAR FARMSSE Athos II, LLC
SE Athos II, LLC is a 602 MW operating power plant in Riverside County, California, operated by SE Athos II, LLC.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| IPAT2 | Solar Photovoltaic | 200 MW | |
| ATHB2 | Batteries | 200 MW | Under construction (up to 50%) |
| ATH1S | Batteries | 102 MW | Under construction (up to 50%) |
| ATH1N | Batteries | 100 MW | Under construction (up to 50%) |
| SEAT2 | Solar Photovoltaic | 200 MW | Cancelled or postponed |
Plant details
- Operator
- SE Athos II, LLC
- Location
- Riverside County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 200 MW
Under construction: 402 MW
Cancelled: 200 MW - First unit online
- Dec 2021
- EIA plant ID
- 64290
Location
33.7513, -115.3550
Nearby power plants
- Athos Solar ProjectSolar farms · 250 MW · 0.0 mi
- Oberon Solar ProjectSolar farms, Battery storage · 375 MW · 2.2 mi
- Oberon II Solar ProjectSolar farms, Battery storage · 375 MW · 2.2 mi
- Easley SolarSolar farms, Battery storage · 940 MW · 2.6 mi
- Desert Harvest, LLCSolar farms · 80.0 MW · 3.7 mi
- Desert Harvest II LLCSolar farms, Battery storage · 105 MW · 3.7 mi
- Maverick Solar, LLCSolar farms · 125 MW · 3.8 mi
- Maverick Solar 4, LLCSolar farms · 100 MW · 3.8 mi
- Maverick Solar 6, LLCSolar farms, Battery storage · 150 MW · 3.8 mi
- Maverick Solar 7, LLCSolar farms · 132 MW · 3.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem