United States › Power plants › Solar farms › California
SOLAR FARMS · BATTERY STORAGECA Bloomington 2551 S Lilac Avenue Micro
CA Bloomington 2551 S Lilac Avenue Micro is a 3.0 MW under construction solar and battery storage plant in San Bernardino County, California, operated by Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Nov 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 18263 | Solar Photovoltaic | 1.5 MW | Under construction (over 50%) |
| B8263 | Batteries | 1.5 MW | Under construction (over 50%) |
Plant details
- Operator
- Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC
- Location
- San Bernardino County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 3.0 MW
- EIA plant ID
- 66475
Location
34.0552, -117.3778
Nearby power plants
- IGS SBD1Solar farms · 2.6 MW · 1.2 mi
- Colton Solar Two, LLCSolar farms · 1.0 MW · 1.3 mi
- Agua Mansa Power PlantGas power plants · 60.5 MW · 1.4 mi
- Century Generating FacilityGas power plants · 44.8 MW · 1.5 mi
- Drews Generating FacilityGas power plants · 44.8 MW · 1.5 mi
- ESCA-LL-COLTON, LLCSolar farms · 2.6 MW · 1.5 mi
- Rialto - High SchoolSolar farms · 0.9 MW · 2.7 mi
- CA Riverside 2356 Fleetwood Dr.Solar farms, Battery storage · 4.0 MW · 3.0 mi
- Condor Energy Storage LLCBattery storage · 200 MW · 3.5 mi
- Colton Solar One, LLCSolar farms · 2.5 MW · 4.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem