United States › Power plants › Solar farms › California
SOLAR FARMS · BATTERY STORAGECA Riverside 2356 Fleetwood Dr.
CA Riverside 2356 Fleetwood Dr. is a 4.0 MW under construction solar and battery storage plant in Riverside County, California, operated by Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Nov 2026 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Nov 2026.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 18262 | Solar Photovoltaic | 2.0 MW | Under construction (over 50%) |
| B8262 | Batteries | 2.0 MW | Under construction (over 50%) |
Plant details
- Operator
- Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC
- Location
- Riverside County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 4.0 MW
- EIA plant ID
- 66511
Location
34.0121, -117.3811
Nearby power plants
- IGS SBD1Solar farms · 2.6 MW · 1.9 mi
- SSI West Riverside Landfill LLCSolar farms · 2.5 MW · 2.2 mi
- ESCA-LL-COLTON, LLCSolar farms · 2.6 MW · 2.2 mi
- Agua Mansa Power PlantGas power plants · 60.5 MW · 2.3 mi
- Colton Solar Two, LLCSolar farms · 1.0 MW · 2.4 mi
- Tequesquite Landfill Solar PV ProjectSolar farms · 7.3 MW · 2.4 mi
- Riverside Community CollegeSolar farms, Battery storage · 2.6 MW · 2.8 mi
- Condor Energy Storage LLCBattery storage · 200 MW · 2.8 mi
- CA Bloomington 2551 S Lilac Avenue MicroSolar farms, Battery storage · 3.0 MW · 3.0 mi
- Century Generating FacilityGas power plants · 44.8 MW · 3.7 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem