United States › Power plants › Solar farms › California
SOLAR FARMS · BATTERY STORAGEZeta Solar & Storage
Zeta Solar & Storage is a 150 MW under construction solar and battery storage plant in Merced County, California, operated by Zeta Solar, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Jun 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| GEN01 | Solar Photovoltaic | 75 MW | Under construction (up to 50%) |
| GEN02 | Batteries | 75 MW | Under construction (up to 50%) |
Plant details
- Operator
- Zeta Solar, LLC
- Location
- Merced County, California
- Balancing authority
- CISO
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 150 MW
- EIA plant ID
- 67676
Location
36.9119, -120.8101
Nearby power plants
- Vega SolarSolar farms · 20.0 MW · 1.1 mi
- Merced BESSBattery storage · 3.0 MW · 6.5 mi
- Lara 2 HybridSolar farms, Battery storage · 1.6 MW · 6.5 mi
- Merced 1 PVSolar farms · 3.0 MW · 6.5 mi
- Oro LomaSolar farms · 20.0 MW · 8.2 mi
- Althea Avenue SolarSolar farms · 8.9 MW · 8.6 mi
- Merced 2 BESSBattery storage · 2.0 MW · 10.1 mi
- Wright Solar ParkSolar farms · 200 MW · 10.6 mi
- OWC Energy Holdings, LLCSolar farms · 2.0 MW · 10.6 mi
- Stellar Wright BESSBattery storage · 84.8 MW · 10.8 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem