United States › Power plants › Solar farms
OCTARY USA · SOLAR FARMSPlanned solar farms in the USA — page 2
Every utility-scale solar farm in the United States of 1 MW or more: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Operating7,669plants
Operating capacity172.0 GWnameplate
Under construction46.7 GW601 plants
Whole pipeline122.2 GWplanned, approved and building
Map
Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
348 plants · page 2 of 7
| Plant | Capacity | Stage |
|---|---|---|
| Red Butte Solar and Storage | 300 MW | In planning |
| Red Hollow Renewable Energy | 300 MW | In planning |
| Robinson Solar | 300 MW | In planning |
| Rocky Run Solar | 300 MW | In planning |
| Southern Bighorn Solar Hybrid | 300 MW | In planning |
| Sunrose Renewable Energy | 300 MW | In planning |
| THREE SISTERS Solar Generation and BESS | 300 MW | In planning |
| Utah Solar 1 | 300 MW | In planning |
| Uvalde Solar 2 | 300 MW | In planning |
| Abercrombie Solar | 295 MW | In planning |
| South Ripley Solar | 270 MW | In planning |
| Peach Wood Solar | 261 MW | In planning |
| OCI SunRoper | 260 MW | In planning |
| Oak Valley Solar | 251 MW | In planning |
| Athens Solar I (Hybrid) | 250 MW | In planning |
| Clairemont Solar | 250 MW | In planning |
| Freedom Pine Solar | 250 MW | In planning |
| Hawkeye Solar II, LLC | 250 MW | In planning |
| Lazy U Solar 1 | 250 MW | In planning |
| Lazy U Solar 2 | 250 MW | In planning |
| Mill Point Solar | 250 MW | In planning |
| Moonlight Flats Solar Power 1 | 250 MW | In planning |
| Mystic Springs Renewable Energy (Hybrid) | 250 MW | In planning |
| Patoka Solar | 250 MW | In planning |
| Prairie Oak Solar | 250 MW | In planning |
| Rock House Solar | 250 MW | In planning |
| Sawtooth Solar | 250 MW | In planning |
| Selenite Springs Solar | 250 MW | In planning |
| TREX US Red Holly | 250 MW | In planning |
| Salmonfly Solar and Storage | 247 MW | In planning |
| Lake Trout Solar | 245 MW | In planning |
| Lupinus Solar 2, LLC | 244 MW | In planning |
| Rich Road Solar Energy Center | 240 MW | In planning |
| Despain Solar | 236 MW | In planning |
| AC Ranch II | 230 MW | In planning |
| ATLAS Solar X, LLC | 225 MW | In planning |
| Emerald Bluffs Solar Park | 225 MW | In planning |
| Kingsley Solar Farm | 225 MW | In planning |
| Alira | 223 MW | In planning |
| Eastern Cottontail Solar | 220 MW | In planning |
| Leuven Solar LLC | 217 MW | In planning |
| Sycamore Cross Solar | 208 MW | In planning |
| CO Bar C Solar and BESS | 206 MW | In planning |
| Henry Solar | 206 MW | In planning |
| SGT Hoskins Solar Project Hybrid | 204 MW | In planning |
| Erath County Solar | 204 MW | In planning |
| Erin | 202 MW | In planning |
| Axton Solar | 201 MW | In planning |
| Echols Grove Solar | 201 MW | In planning |
| Abeja Solar Farm | 200 MW | In planning |
Page 2 of 7
← Previous Next →
Operating capacity by state
Click a state to drill down.
AK8MWME968MWVT156MWNH8MWWA348MWID827MWMT181MWND–MN2.2GWIL5.9GWWI2.6GWMI3.3GWNY3.2GWRI452MWMA1.5GWOR1.5GWNV5.5GWWY242MWSD217MWIA701MWIN5.3GWOH5GWPA1.2GWNJ1.3GWCT502MWCA26GWUT3.5GWCO3.4GWNE160MWMO1.9GWKY1.4GWWV259MWVA5.3GWMD1.4GWDE139MWAZ9.1GWNM3.3GWKS434MWAR2.8GWTN1.2GWNC7.1GWSC2GWDC35MWOK1.2GWLA1.6GWMS1.7GWAL986MWGA5.5GWHI578MWTX35GWFL13GW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Vesper Energy Development LLC15 plants · 3,378 MW
- BrightNight Power5 plants · 3,257 MW
- Cypress Creek Renewables18 plants · 2,424 MW
- Clenera DevCo LLC6 plants · 1,775 MW
- EDF Renewables Development, Inc.7 plants · 1,629 MW
- Intersect USA, LLC3 plants · 1,305 MW
- Repsol Renewables NA5 plants · 1,225 MW
- TerraForm Power Operating, LLC2 plants · 1,214 MW
- Sunstone Solar, LLC1 plants · 1,200 MW
- Vista Sands Solar LLC1 plants · 1,182 MW
- Leeward Asset Management, LLC7 plants · 1,098 MW
- Dominion Renewable Energy5 plants · 1,025 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map