United States › Power plants › Battery storage › Arizona
BATTERY STORAGE · SOLAR FARMSTHREE SISTERS Solar Generation and BESS
THREE SISTERS Solar Generation and BESS is a 600 MW planned power plant in Pinal County, Arizona, operated by THSI bn, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2029 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Apr 2029.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| THSI1 | Batteries | 300 MW | Regulatory approvals pending |
| THSI2 | Solar Photovoltaic | 300 MW | Regulatory approvals pending |
Plant details
- Operator
- THSI bn, LLC
- Location
- Pinal County, Arizona
- Balancing authority
- AZPS
- Sector
- IPP Non-CHP
- Capacity
- Planned: 600 MW
- EIA plant ID
- 68298
Location
32.0537, -109.8230
Nearby power plants
- Apache Solar ISolar farms, Battery storage · 40.0 MW · 4.1 mi
- Apache StationCoal power plants, Gas power plants · 782 MW · 4.1 mi
- Sulphur SpringsSolar farms · 20.0 MW · 5.7 mi
- Roadrunner Solar and BESSSolar farms, Battery storage · 470 MW · 6.9 mi
- Winchester Solar I, LLCSolar farms, Battery storage · 176 MW · 11.9 mi
- Winchester Solar II, LLCSolar farms, Battery storage · 176 MW · 12.7 mi
- Red Horse IIISolar farms · 30.0 MW · 14.5 mi
- Red Horse 2Solar farms, Wind farms · 81.0 MW · 22.3 mi
- SR McNealSolar farms, Battery storage · 40.0 MW · 35.2 mi
- Babacomari SolarSolar farms · 160 MW · 44.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem