United States βΊ Power plants βΊ Battery storage βΊ Arizona
BATTERY STORAGE Β· SOLAR FARMSSR McNeal
SR McNeal is a 40.0 MW operating power plant in Cochise County, Arizona, operated by SR McNeal, LLC. Its batteries store up to 20 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| MCBA | Batteries | 20 MW 20 MWh |
|
| MCNEA | Solar Photovoltaic | 20 MW |
Plant details
- Operator
- SR McNeal, LLC
- Location
- Cochise County, Arizona
- Balancing authority
- TEPC
- Sector
- IPP Non-CHP
- Capacity
- Operating: 40.0 MW
- First unit online
- Dec 2023
- EIA plant ID
- 66925
Location
31.5551, -109.7013
Nearby power plants
- DouglasOil-fired power plants Β· 26.1 MW Β· 15.8 mi
- THREE SISTERS Solar Generation and BESSSolar farms, Battery storage Β· 600 MW Β· 35.2 mi
- Apache StationCoal power plants, Gas power plants Β· 782 MW Β· 36.7 mi
- Apache Solar ISolar farms, Battery storage Β· 40.0 MW Β· 37.1 mi
- Sulphur SpringsSolar farms Β· 20.0 MW Β· 37.3 mi
- Fort Huachuca Solar PV ProjectSolar farms Β· 17.7 MW Β· 38.2 mi
- Roadrunner Solar and BESSSolar farms, Battery storage Β· 470 MW Β· 39.2 mi
- Babacomari SolarSolar farms Β· 160 MW Β· 42.5 mi
- Red Horse IIISolar farms Β· 30.0 MW Β· 45.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem