United States › Power plants › Texas
OCTARY USA · POWER PLANTSCancelled power plants in Texas — page 3
Every power plant in the United States with a generator of 1 MW or more, from solar, wind and batteries to gas, nuclear, hydro and coal: operating, under construction, planned, retired and cancelled. Click a state to drill down, or search near a place.
Map
Plants
| Plant | Capacity | Stage |
|---|---|---|
| Peri Peri Solar Solar farms |
115 MW | Withdrawn / abandoned |
| Bearkat Wind farms |
103 MW | Withdrawn / abandoned |
| Jayhawk Solar farms |
101 MW | Withdrawn / abandoned |
| Echols Grove Solar Battery storage |
101 MW | Withdrawn / abandoned |
| Jim Wells BESS Battery storage |
100 MW | Withdrawn / abandoned |
| Alamo 3 BESS 2 Battery storage |
100 MW | Withdrawn / abandoned |
| Alamo 4 BESS Battery storage |
100 MW | Withdrawn / abandoned |
| Alamo 5 BESS 1 Battery storage |
100 MW | Withdrawn / abandoned |
| Alamo 5 BESS 2 Battery storage |
100 MW | Withdrawn / abandoned |
| Berkman Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Big Elm Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Bluegrove Wind Wind farms |
100 MW | Withdrawn / abandoned |
| Chiltepin Solar Solar farms |
100 MW | Withdrawn / abandoned |
| Lamesa Solar Solar farms |
100 MW | Withdrawn / abandoned |
| OCI Lone Sun Solar farms |
100 MW | Withdrawn / abandoned |
| Sandman Solar Battery storage |
100 MW | Withdrawn / abandoned |
| TX 14 Venus Mill Storage Battery storage |
100 MW | Withdrawn / abandoned |
| TX17 Nickel Prairie Storage Battery storage |
100 MW | Withdrawn / abandoned |
| TX18 Cottage Meadow Storage Battery storage |
100 MW | Withdrawn / abandoned |
| White Camp Solar Solar farms |
100 MW | Withdrawn / abandoned |
| Payne Battlecreek Solar Solar farms |
85.0 MW | Withdrawn / abandoned |
| Hooper Solar and Storage Solar farms, Battery storage |
81.2 MW | Withdrawn / abandoned |
| Cotton Belle Solar Solar farms |
80.0 MW | Withdrawn / abandoned |
| Solemio LLC Solar farms |
80.0 MW | Withdrawn / abandoned |
| Tex-Mex Renewable Energy Project, LLC Wind farms |
80.0 MW | Withdrawn / abandoned |
| Majestic 2 Wind Farm Wind farms |
79.2 MW | Withdrawn / abandoned |
| Cedar Range Solar Battery storage |
75.7 MW | Withdrawn / abandoned |
| Trinity River Solar 1 Battery storage |
75.0 MW | Withdrawn / abandoned |
| Uvalde 2 BESS 1 Battery storage |
75.0 MW | Withdrawn / abandoned |
| Cardinal Solar (TX) Solar farms |
74.0 MW | Withdrawn / abandoned |
| Orange Grove Battery storage |
61.0 MW | Withdrawn / abandoned |
| Oriana Solar LLC Battery storage |
61.0 MW | Withdrawn / abandoned |
| Tres Margaritas Solar Solar farms |
61.0 MW | Withdrawn / abandoned |
| Itsee Solar Solar farms |
53.3 MW | Withdrawn / abandoned |
| Lupinus Storage 3 Battery storage |
50.9 MW | Withdrawn / abandoned |
| Hallmark Solar farms |
42.0 MW | Withdrawn / abandoned |
| NET Power La Porte Station Gas power plants |
25.5 MW | Withdrawn / abandoned |
| Barilla Solar Battery storage |
20.0 MW | Withdrawn / abandoned |
| Williams Solar, LLC Solar farms |
20.0 MW | Withdrawn / abandoned |
| John Paul Jones Gas power plants |
18.7 MW | Withdrawn / abandoned |
| Imperial Power Plant LLC Gas power plants |
12.0 MW | Withdrawn / abandoned |
| Crockett Battery storage |
9.9 MW | Withdrawn / abandoned |
| Hidden Lakes Battery storage |
9.9 MW | Withdrawn / abandoned |
| West Moore Solar Solar farms |
5.0 MW | Withdrawn / abandoned |
| UTSA TEP II Oil-fired power plants |
3.0 MW | Withdrawn / abandoned |
| Suzlon Project VIII LLC Wind farms |
2.6 MW | Withdrawn / abandoned |
| TX LaPort 10060 Porter Road Solar Solar farms |
1.6 MW | Withdrawn / abandoned |
| TX Houston 7080 Express Lane Battery storage |
1.5 MW | Withdrawn / abandoned |
| Baytown Bioenergy plants |
1.3 MW | Withdrawn / abandoned |
| WAL4279 Gas power plants |
1.2 MW | Withdrawn / abandoned |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Capacity by technology
Solid: operating. Light: planned or under construction.
- Gas power plants83.1 GW · +20.7 GW pipeline
- Solar farms35.0 GW · +37.3 GW pipeline
- Wind farms44.5 GW · +4,832 MW pipeline
- Battery storage19.3 GW · +25.3 GW pipeline
- Coal power plants15.6 GW
- Nuclear power plants5,139 MW · +4,468 MW pipeline
- Oil-fired power plants879 MW · +9.9 MW pipeline
- Hydroelectric plants715 MW
- Other power plants445 MW · +38.5 MW pipeline
- Bioenergy plants265 MW
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Luminant Generation Company LLC11 plants · 7,776 MW
- Solar Proponent LLC6 plants · 5,124 MW
- Coronado Power Ventures LLC2 plants · 2,035 MW
- Navasota Energy Generation Holdings3 plants · 1,647 MW
- Cypress Creek Renewables8 plants · 1,480 MW
- Consolidated Edison Development Inc.10 plants · 1,225 MW
- Rockwood Energy Center LLC1 plants · 1,068 MW
- Brazos Electric Power Coop Inc1 plants · 928 MW
- Austin Energy1 plants · 925 MW
- Pondera Development LLC1 plants · 900 MW
- Calpine Central LP1 plants · 900 MW
- Belltown Power Texas 2, LLC6 plants · 819 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map