United States βΊ Power plants βΊ Solar farms βΊ Texas
SOLAR FARMSHallmark
Hallmark is a 42.0 MW cancelled solar farm in Hunt County, Texas, operated by Luminant Generation Company LLC.
Plant statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| UNIT1 | Solar Photovoltaic | 42 MW | Cancelled or postponed |
Plant details
- Operator
- Luminant Generation Company LLC
- Location
- Hunt County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Cancelled: 42.0 MW
- EIA plant ID
- 63234
Location
33.1800, -96.0972
Nearby power plants
- Powerlane PlantGas power plants, Oil-fired power plants Β· 112 MW Β· 1.8 mi
- Sterling Solar (TX)Solar farms Β· 10.0 MW Β· 4.5 mi
- Leon SolarSolar farms Β· 10.0 MW Β· 8.3 mi
- Cunningham StorageBattery storage Β· 190 MW Β· 12.2 mi
- BT Signal RanchSolar farms Β· 50.0 MW Β· 13.4 mi
- Coniglio SolarSolar farms Β· 124 MW Β· 15.5 mi
- Mcmurtre StorageBattery storage Β· 176 MW Β· 16.7 mi
- Farmersville WestBattery storage Β· 9.9 MW Β· 17.7 mi
- Cedar Range SolarSolar farms Β· 150 MW Β· 17.8 mi
- Farmersville (TX)Battery storage Β· 9.9 MW Β· 18.1 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem