United States › Power plants › Battery storage › Texas
BATTERY STORAGEMcmurtre Storage
Mcmurtre Storage is a 176 MW planned battery storage site in Hunt County, Texas, operated by Belltown Power Texas 2, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| MCMBA | Batteries | 176 MW | Regulatory approvals pending |
Plant details
- Operator
- Belltown Power Texas 2, LLC
- Location
- Hunt County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 176 MW
- EIA plant ID
- 68171
Location
33.1797, -95.8092
Nearby power plants
- Bright Arrow Solar, LLCSolar farms, Battery storage · 404 MW · 5.5 mi
- Lucky 7 Solar Farm LLCSolar farms · 100 MW · 8.5 mi
- Cedar Range SolarSolar farms · 150 MW · 8.5 mi
- Cartwheel 1 - Storage, LLCBattery storage · 300 MW · 12.8 mi
- Barrett Solar ProjectSolar farms · 125 MW · 16.7 mi
- Powerlane PlantGas power plants, Oil-fired power plants · 112 MW · 18.4 mi
- Cunningham StorageBattery storage · 190 MW · 19.6 mi
- Hopkins Energy LLCSolar farms · 250 MW · 20.2 mi
- Estonian Solar Project, LLCSolar farms, Battery storage · 305 MW · 20.8 mi
- BT Signal RanchSolar farms · 50.0 MW · 20.9 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem