🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Power plants › Solar farms › Texas

SOLAR FARMS

Tres Margaritas Solar

Tres Margaritas Solar is a 61.0 MW cancelled solar farm in Dimmit County, Texas, operated by Gransolar Texas Six LLC.

Plant statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Open in Google MapsMore solar farms in Texas

Generators

Each generating unit EIA lists at this plant.

UnitTechnologyCapacityStatusOnlineRetired / planned retirement
GRS6Solar Photovoltaic61 MW Cancelled or postponed

Plant details

Operator
Gransolar Texas Six LLC
Location
Dimmit County, Texas
Balancing authority
ERCO
Sector
IPP Non-CHP
Capacity
Cancelled: 61.0 MW
EIA plant ID
67789

Location

28.6048, -99.4693

Nearby power plants

Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem