United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2006-030, Terry County

Onshore wind project GEN-2006-030, Terry County is a 150 MW onshore wind request withdrawn in the SPP interconnection queue, in Terry County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2006-030
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Location
Terry County, Texas
Technology
Wind: 150 MW
Total requested
150 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
15 August 2006
Proposed online date
May 2008

Location

Marker shows the centre of Terry County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Terry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem