Solar project GEN-2016-077, Terry County

Solar project GEN-2016-077, Terry County is a 54.0 MW solar request withdrawn in the SPP interconnection queue, in Terry County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2016 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-077
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Lakeview-Brownfield 69kV line
Location
Terry County, Texas
Technology
Solar: 54.0 MW
Total requested
54.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 June 2016
Proposed online date
December 2022
Withdrawn
September 2020

Location

Marker shows the centre of Terry County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Terry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem