πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

BATTERY STORAGE Β· SPP

Battery storage project GEN-2018-086, Terry County

Battery storage project GEN-2018-086, Terry County is a 50.0 MW battery storage request withdrawn in the SPP interconnection queue, in Terry County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingOct 2024 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-086
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Flatland 115 kV Substation
Location
Terry County, Texas
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
21 November 2018
Proposed online date
October 2024
Came online
October 2024
Withdrawn
December 2022

Location

Marker shows the centre of Terry County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Terry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem