SOLAR Β· SPP

Solar project GEN-2014-044, Terry County

Solar project GEN-2014-044, Terry County is a 50.0 MW solar request withdrawn in the SPP interconnection queue, in Terry County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2014 (completed)
  2. Withdrawn / abandonedFeb 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2014-044
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Terry County 115kV; (Alt. POI) Tap Clauene - Terry County 115kV
Location
Terry County, Texas
Technology
Solar: 50.0 MW
Total requested
50.0 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 September 2014
Proposed online date
December 2016
Withdrawn
February 2015

Location

Marker shows the centre of Terry County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Terry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem