United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2019-079, Gray County
Onshore wind project GEN-2019-079, Gray County is a 13.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Gray County, Kansas, connecting to SUNC.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2024 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-079
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SUNC
- Connection point (POI)
- Gray County 115kV
- Location
- Gray County, Kansas
- Technology
- Wind: 13.0 MW
- Total requested
- 13.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 21 May 2019
- Proposed online date
- December 2024
- Came online
- December 2024
- Withdrawn
- December 2022
Location
Marker shows the centre of Gray County; the queue data does not give exact sites.
Other requests in Gray County
- Solar project GEN-2024-030, Gray CountySolar Β· 150 MW Β· in study
- Onshore wind project GEN-2010-009, Gray CountyOnshore wind Β· 166 MW Β· built
- Onshore wind project GEN-2007-040, Gray CountyOnshore wind Β· 131 MW Β· built
- Onshore wind project GEN-2008-079, Gray CountyOnshore wind Β· 98.9 MW Β· built
- Solar project GEN-2022-203, Gray CountySolar Β· 200 MW Β· withdrawn
- Solar project GEN-2024-093, Gray CountySolar Β· 180 MW Β· withdrawn
- Onshore wind project GEN-2024-097, Gray CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2012-013, Gray CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Solar project GEN-2011-003, Gray CountySolar Β· 10.0 MW Β· withdrawn
- Onshore wind project GEN-2015-026, Gray CountyOnshore wind Β· 8.3 MW Β· withdrawn
- Onshore wind project GEN-2015-027, Gray CountyOnshore wind Β· 4.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem