πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Kansas

ONSHORE WIND Β· SPP

Onshore wind project GEN-2012-013, Gray County

Onshore wind project GEN-2012-013, Gray County is a 99.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Gray County, Kansas, connecting to MKEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedDec 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2012-013
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
MKEC
Connection point (POI)
Gray County Tap 115kV
Location
Gray County, Kansas
Technology
Wind: 99.0 MW
Total requested
99.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
6 April 2012
Proposed online date
December 2012
Withdrawn
December 2012

Location

Marker shows the centre of Gray County; the queue data does not give exact sites.

Power plants in Kansas Β· Transmission lines in Kansas

Other requests in Gray County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem