United States βΊ Grid βΊ Interconnection queues βΊ Kansas
SOLAR Β· SPPSolar project GEN-2022-203, Gray County
Solar project GEN-2022-203, Gray County is a 200 MW solar request withdrawn in the SPP interconnection queue, in Gray County, Kansas, connecting to SUNC.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-203
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SUNC
- Connection point (POI)
- Buckner 345kV Substation
- Location
- Gray County, Kansas
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 28 February 2023
- Proposed online date
- December 2029
- Withdrawn
- November 2023
Location
Marker shows the centre of Gray County; the queue data does not give exact sites.
Other requests in Gray County
- Solar project GEN-2024-030, Gray CountySolar Β· 150 MW Β· in study
- Onshore wind project GEN-2010-009, Gray CountyOnshore wind Β· 166 MW Β· built
- Onshore wind project GEN-2007-040, Gray CountyOnshore wind Β· 131 MW Β· built
- Onshore wind project GEN-2008-079, Gray CountyOnshore wind Β· 98.9 MW Β· built
- Solar project GEN-2024-093, Gray CountySolar Β· 180 MW Β· withdrawn
- Onshore wind project GEN-2024-097, Gray CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project GEN-2012-013, Gray CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Onshore wind project GEN-2019-079, Gray CountyOnshore wind Β· 13.0 MW Β· withdrawn
- Solar project GEN-2011-003, Gray CountySolar Β· 10.0 MW Β· withdrawn
- Onshore wind project GEN-2015-026, Gray CountyOnshore wind Β· 8.3 MW Β· withdrawn
- Onshore wind project GEN-2015-027, Gray CountyOnshore wind Β· 4.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem