Solar project 159, Hamilton County

Solar project 159, Hamilton County is a 74.9 MW solar request withdrawn in the Southeast interconnection queue, in Hamilton County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
159
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Duke Energy Florida, LLC
Connection point (POI)
Hamilton Substation
Location
Hamilton County, Florida
Technology
Solar: 74.9 MW
Total requested
74.9 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
27 September 2016
Proposed online date
October 2020

Location

Marker shows the centre of Hamilton County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Hamilton County