SOLAR · SOUTHEASTSolar project 144A, Hamilton County
Solar project 144A, Hamilton County is a 74.9 MW solar request built and operating in the Southeast interconnection queue, in Hamilton County, Florida, connecting to Duke Energy Florida.
Request details
- Queue ID
- 144A
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Suwannee-Twin Lakes
- Location
- Hamilton County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Operational
- Entered queue
- 6 May 2016
- Proposed online date
- December 2018
- Came online
- December 2018
Location
Marker shows the centre of Hamilton County; the queue data does not give exact sites.
Other requests in Hamilton County
- Solar project FC100012, Hamilton CountySolar · 74.9 MW · in study
- Solar project 338, Hamilton CountySolar · 74.9 MW · suspended
- Solar project 158, Hamilton CountySolar · 74.9 MW · built
- Solar project 99, Hamilton CountySolar · 102 MW · withdrawn
- Solar project 103, Hamilton CountySolar · 100 MW · withdrawn
- Solar project 194B, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project 329, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project 331, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project 138A, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project FC100016, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project FC100015, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project 159, Hamilton CountySolar · 74.9 MW · withdrawn