United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 338, Hamilton County
Solar project 338, Hamilton County is a 74.9 MW solar request suspended in the Southeast interconnection queue, in Hamilton County, Florida, connecting to Duke Energy Florida.
Queue statusPaused / redesign
- PlanningQueued Nov 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 338
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Twin Rivers Switching Station
- Location
- Hamilton County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Queue status
- Suspended
- Entered queue
- 17 November 2023
- Proposed online date
- December 2025
Location
Marker shows the centre of Hamilton County; the queue data does not give exact sites.
Other requests in Hamilton County
- Solar project FC100012, Hamilton CountySolar · 74.9 MW · in study
- Solar project 144A, Hamilton CountySolar · 74.9 MW · built
- Solar project 158, Hamilton CountySolar · 74.9 MW · built
- Solar project 99, Hamilton CountySolar · 102 MW · withdrawn
- Solar project 103, Hamilton CountySolar · 100 MW · withdrawn
- Solar project 194B, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project 329, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project 331, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project 138A, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project FC100016, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project FC100015, Hamilton CountySolar · 74.9 MW · withdrawn
- Solar project 159, Hamilton CountySolar · 74.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem