SOLAR Β· SOUTHEASTSolar project 99, Hamilton County
Solar project 99, Hamilton County is a 102 MW solar request withdrawn in the Southeast interconnection queue, in Hamilton County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 99
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Location
- Hamilton County, Florida
- Technology
- Solar: 102 MW
- Total requested
- 102 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 10 April 2009
- Proposed online date
- December 2013
Location
Marker shows the centre of Hamilton County; the queue data does not give exact sites.
Other requests in Hamilton County
- Solar project FC100012, Hamilton CountySolar Β· 74.9 MW Β· in study
- Solar project 338, Hamilton CountySolar Β· 74.9 MW Β· suspended
- Solar project 144A, Hamilton CountySolar Β· 74.9 MW Β· built
- Solar project 158, Hamilton CountySolar Β· 74.9 MW Β· built
- Solar project 103, Hamilton CountySolar Β· 100 MW Β· withdrawn
- Solar project 194B, Hamilton CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 329, Hamilton CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 331, Hamilton CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 138A, Hamilton CountySolar Β· 74.9 MW Β· withdrawn
- Solar project FC100016, Hamilton CountySolar Β· 74.9 MW Β· withdrawn
- Solar project FC100015, Hamilton CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 159, Hamilton CountySolar Β· 74.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem