United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

COAL Β· PJM

Rockport Unit 1

Rockport Unit 1 is a 20.0 MW coal request built and operating in the PJM interconnection queue, in Spencer County, Indiana, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Jan 2007 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingNov 2011 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
R97
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Rockport 765kV
Location
Spencer County, Indiana
Technology
Coal: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
31 January 2007
Proposed online date
November 2011
Came online
November 2011

Location

Marker shows the centre of Spencer County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Spencer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem