Rockport Unit #1

Rockport Unit #1 is a 36.0 MW coal request built and operating in the PJM interconnection queue, in Spencer County, Indiana, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Feb 2013 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2017 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Y3-038
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Rockport Unit 1
Location
Spencer County, Indiana
Technology
Coal: 36.0 MW
Total requested
36.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
28 February 2013
Proposed online date
June 2017
Came online
June 2017

Location

Marker shows the centre of Spencer County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Spencer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem