United States › Grid › Interconnection queues › Washington
BATTERY STORAGE · WESTBattery storage project CS23-12, Franklin County
Battery storage project CS23-12, Franklin County is a 199 MW battery storage request with a signed interconnection agreement in the West interconnection queue, in Franklin County, Washington, connecting to Avista Utilities.
Queue statusConsented
- PlanningQueued May 2023 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Jul 2029 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- CS23-12
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avista Utilities
- Connection point (POI)
- Saddle Mountain - Walla Walla 230kV
- Location
- Franklin County, Washington
- Technology
- Battery: 199 MW
- Total requested
- 199 MW
- Service type
- NRIS and ERIS
- Study phase
- Request Status: LGIA; Facilities Study: Complete; Phase One Cluster Study: Complete; Phase One Re-Study: N/A; Phase Two
- Queue status
- Active
- Entered queue
- 1 May 2023
- Proposed online date
- July 2029
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Franklin County
- Solar + storage project 99, Franklin CountySolar + storage · 200 MW · in study
- Solar project G0689, Franklin CountySolar · 13.3 MW · in study
- Battery storage project G1079, Franklin CountyBattery storage · 10.0 MW · in study
- Solar project G1004, Franklin CountySolar · 10.0 MW · in study
- Esquatzel ProjectHydro · 2.0 MW · built
- Solar + storage project TCS-08, Franklin CountySolar + storage · 200 MW · withdrawn
- Solar + storage project C1-36, Franklin CountySolar + storage · 200 MW · withdrawn
- Solar + storage project C4-013, Franklin CountySolar + storage · 199 MW · withdrawn
- Solar + storage project CS24-08, Franklin CountySolar + storage · 199 MW · withdrawn
- Solar project G0564, Franklin CountySolar · 80.0 MW · withdrawn
- 01 37MW ConnellGas · 37.0 MW · withdrawn
- 02 37MW Franklin PUD,Franklin RiverviewGas · 37.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem